This project consisted of new roundabout constructions, dual lanes with extensive island treatments. Wespray applied over 3000m2 of herringbone red faux pave highlighting all the new road treatments....
P.S. Structures had recently built the new aquatic centre with concrete terraces and seating. Wespray applied a textured slip reducing finish to all steps and landings on the terraces in a neutral concrete colour....
The indoor assembly/canteen area were treated in a solid French Grey with an aggregate fleck which included the ramp to the stage area....
For urgent enquiries, please call: 0418 429 499