Working with the design team at Adventure World, Wespray were commissioned to apply a brightly coloured surface to the concrete around the latest rides and attractions....
P.S. Structures had recently built the new aquatic centre with concrete terraces and seating. Wespray applied a textured slip reducing finish to all steps and landings on the terraces in a neutral concrete colour....
Metronet works including the Morley to Ellenbrook train lines (Melconxx)
Consists of the Malaga train staton, Whiteman Park train station,...
For urgent enquiries, please call: 0418 429 499