Through 2013 to 2015 over 2000m2 of dual use concrete paths were coasted to mimic the red asphalt/bitumen look.
Working closely with dowsing,...
Working within a live fuel station precinct.Project included 800m2 of a faux paved tile effect. Including 11 pedestrian crossing points to multiple fast food sites....
Working with Santelli Architects, Aranmore Catholic Primary School required a slip reducing finish to the recently completed classroom corridors, stairwells and undercover assembly area....
For urgent enquiries, please call: 0418 429 499