Resurfaced over 2000m in a faux aggregate finish 400 km north of Perth.Extensive surface preparation including grinding of existing surfaces,...
P.S. Structures had recently built the new aquatic centre with concrete terraces and seating. Wespray applied a textured slip reducing finish to all steps and landings on the terraces in a neutral concrete colour....
For urgent enquiries, please call: 0418 429 499