The project consisted of intersection upgrades with extended turning pockets allowing better traffic flow for the heavy vehicles in and out of the marine complex....
This project required the application of various colours to different concrete surfaces incorporating motifs to form a snakes and ladders game....
Through 2013 to 2015 over 2000m2 of dual use concrete paths were coasted to mimic the red asphalt/bitumen look.
Working closely with dowsing,...
For urgent enquiries, please call: 0418 429 499