Application of a blue stream winding through the play space.
Spraying a textured rock Finish to tunnels including anti graffiti coatings....
P.S. Structures had recently built the new aquatic centre with concrete terraces and seating. Wespray applied a textured slip reducing finish to all steps and landings on the terraces in a neutral concrete colour....
Resurfaced over 2000m in a faux aggregate finish 400 km north of Perth.Extensive surface preparation including grinding of existing surfaces,...
For urgent enquiries, please call: 0418 429 499