Through 2013 to 2015 over 2000m2 of dual use concrete paths were coasted to mimic the red asphalt/bitumen look.
Working closely with dowsing,...
Application of a blue stream winding through the play space.
Spraying a textured rock Finish to tunnels including anti graffiti coatings....
Resurfaced over 2000m in a faux aggregate finish 400 km north of Perth.Extensive surface preparation including grinding of existing surfaces,...
For urgent enquiries, please call: 0418 429 499