Wespray are proud to have worked on the new entry roads to the new Perth Stadium.
Another quality finish to compliment this amazing structure....
Through 2013 to 2015 over 2000m2 of dual use concrete paths were coasted to mimic the red asphalt/bitumen look.
Working closely with dowsing,...
Working within a live fuel station precinct.Project included 800m2 of a faux paved tile effect. Including 11 pedestrian crossing points to multiple fast food sites....
For urgent enquiries, please call: 0418 429 499