Wespray are proud to have worked on the new entry roads to the new Perth Stadium.
Another quality finish to compliment this amazing structure....
Hale Middle School in Wembley Downs required a durable textured finish to the slippery smooth concrete corridors and common areas on the ground and first floor....
Both projects by Diploma Constructions required a slip reducing service to all corridors/walkways and balconies.
Over 70 balconies and 1840 m² of walkways are covered with a solid French grey colour plus flecks....
For urgent enquiries, please call: 0418 429 499